PowerEarth has recently won the contract with SPARK NEL to provide power system, high voltage protection and earthing system engineering design services associated with the enabling and construction supply of the North East Link project in Victoria. The project is expected to be completed in 2023.
The North East Link is a key transport infrastructure project that will connect Melbourne’s growing northeastern suburbs with the city’s existing freeway network.
PowerEarth’s provide power system, high voltage protection and earthing system engineering design work on the North East Link will ensure the safe and reliable operation of the power system during construction and once the link is operational.
PowerEarth has a long history of supporting our clients with system studies and protection systems. PowerEarth’s studies capability includes:
- AC and DC fault studies
- Load flow and voltage drop studies
- Cable and equipment sizing and specification
- Harmonics
- Protection settings
- Arc hazard assessments
- Traction modelling
PowerEarth is committed to providing our clients with power system protection that is fit for purpose and will stand the test of time. Our power system protection engineering work on the North East Link is just one example of how we are delivering on this commitment.
PowerEarth has a long history of delivering power system protection solutions for major infrastructure projects in Australia and overseas. We are proud to be part of this important project that will improve connectivity and liveability for Melbourne residents.